INDUSTRIAL PROJECTS

CLASS “A” INDUSTRIAL BUILDING
GOLDEN LOGISTIC

Torreón, Coahuila
• 10,692 m²
• 258.420 kg
• KR18 system, earthworks, foundations, civil works, metal structure
• Duration: 8 months 2 weeks
CLASS “A” INDUSTRIAL BUILDING
GALLEGOS G4 INDUSTRIAL BUILDING

NAVE INDUSTRIAL G4
GALLEGOS CARROCERIAS

Manila, Durango
• 10,455 m²
• 557,503.32 kg
• KR-18 system
• Duration: 10 months
GALLEGOS G3 INDUSTRIAL BUILDING

NAVE INDUSTRIAL G3
GALLEGOS CARROCERIAS

Manila, Durango
• 17,754 m²
• 439,410 kg
• Sistema KR-18
• Duración: 9 meses

SHIP FOR RAILWAY DIESEL DISTRIBUTION
ALCOM

Monterrey, Nuevo León
• 2,054 m²
• 152.257 kg
• R-101 Pintro foil
• Duration: 2 months
SHIP FOR RAILWAY DIESEL DISTRIBUTION

GALLEGOS-GALLEGOS CARROCERIAS CARROSCERIAS PAINT BOOTH

Manila, Durango
• 1,988.5 m²
• 93.628 kg
• KR-18 system
• Duration: 8 months
GALLEGOS BODY PAINTING BOOTH

GESOL INDUSTRIAL BUILDING

Torreón, Coahuila
• 5,000 m²
• Earthwork, supplies and assembly of metal structures, and lamination
GESOL INDUSTRIAL BUILDING

NAVES INDUSTRIALES GOLDEN LOGISTICS

Monterrey, Nuevo León
• 32,700 m² in 5 different buildings
• Foundations, metal structures, metal roof lamination, perimeter walls, warehouse floor
NAVES INDUSTRIALES GOLDEN LOGISTICS

PLANT POWDERED MILK PRODUCTS LONEG

Gómez Palacio, Durango
• 978940.41 kg
• Duration: 1 year
POWDERED MILK PLANT
COMMERCIAL PROJECTS

DON PERFECTO VINEYARD EVENT ROOM

Parras, Coahuila
• 1,641 m²
• 93,000 kg
• 1-1/2" Multyroof Panel and Losacero Laminate
• Start of March 2025
DON PERFECTO VINEYARD EVENT ROOM
COVA EVENT CENTER

COVA EVENT CENTER

Torreón, Coahuila
• Metal structure
• Prefabricated steel system with quick assembly • Bracket for structural safety and corrosion protection
CONVENIENCE STORES

CONVENIENCE STORES LA ESMERALDA

Cd. Lerdo, Durango
• 2,902 m²
• 156778.73 kg
• Panel
• 1-1/2" Multi Roof and Losacero Foil
• Duration: 4 months

TORRE CONSULTORIOS50 DOCTORS

Torreón, Coahuila
• 2,054 m²
• 152.257 kg
• R-101 Pintro foil
• Duration: 2 months
TORRE CONSULTORIOS 50 DOCTORS

FERRETO INDUSTRIAL SHIP

Cd. Juarez, Chihuahua
• 5,150 m²
• 162.621 kg
• KR-18 system
• Duration: 9 months
FERRETO INDUSTRIAL SHIP

INDUSTRIAL BUILDING FOR HOSPITALIZATION

Torreón, Coahuila
• 1,393.67 m²
• 53,043.01 kg
• KR-18 system
• Duration: 5 months
INDUSTRIAL BUILDING FOR HOSPITALIZATION

INDUSTRIAL WAREHOUSE FOR STORAGE/FERRETO

Monterrey, Nuevo León
• 4,626 m²
• 130.111 kg
• KR-18 system
• Duration: 5 months
INDUSTRIAL WAREHOUSE FOR STORAGE/FERRETO

SPANISH SANATORIUM APP

Torreón, Coahuila
• Expansion of the main structure in the area of operating rooms and rooms
SPANISH SANATORIUM APP

PLAZA 505 SHOPPING PLAZA

Torreón, Coahuila
• 6,298.6 m²
• 200 Tm Metal structure
• 3,500 m² Losacero system
• Terraces, foundations, civil works, and metal structure
SHOPPING PLAZA
AGRICULTURAL PROJECTS

POULTRY HOUSES FOR FATTENING

Matamoros, Coahuila
• 4 Sheds of 14 x 160 meters
• 9,520 m²92,060 kg
• Zintro R-101 Galvanized Sheet
• Duration: 6 months
POULTRY HOUSES FOR FATTENING
BREEDING POULTRY FARMS

BREEDING POULTRY FARMS

Ceballos, Durango
Development of 48 breeding poultry farms using a modular construction model and the use of cutting-edge technologies, including concrete production with our Fiori mobile plant
LAS VEGAS STABLE

LAS VEGAS STABLE

Torreón, Coahuila
Structure for pens and milking room
INTERNATIONAL PROJECTS

COURTS PICKLE BALLDAVID KOMET

San Antonio, Texas
• 2,710 m²
• 18.1815 kg
• 6" Multi-Roof Panel
• Duration: 7 months
PICKLE BALL COURTS
SPANISH
HOMERESOURCESPROYECTSCONTACT
Blvr. Centenario 253, Ejido el Ranchito, 27107 Torreón, Coah
+52 871 150 5550
+52 871 897 6202
costos@cayarga.com.mx
Cayarga Constructora
cayarga_constructora
Cayarga Constructora