G4 INDUSTRIAL BUILDING
GALLEGOS CARROCERIAS

Manila, Durango
• 17,754 m²
• 439,410 tons
• KR-18 system
• Duration: 9 months

G3 INDUSTRIAL BUILDING
GALLEGOS CARROCERIAS

Manila, Durango
• 10,455 m²
• 557,503.32 tons
• KR-18 system
• Duration: 10 months

nave ferroviaria para distribución de gas lp

Salinas Victoria Nuevo León
• 2,054 m²
• 152,257 tons
• R-101 Pintro foil
• Duration: 2 months

GALLEGOS BODY PAINTING BOOTH

Manila, Durango
• 1,988.5 m²
• 93.628 tons
• KR-18 system
• Duration: 4 months

GESOL INDUSTRIAL BUILDING

Torreón, Coahuila
• 5,000 m²
• Terraces, metal structure, kr-18 system roof, prefabricated concrete walls

GOLDEN LOGISTICS INDUSTRIAL BUILDINGS

Torreon , Coahuila
• 32,700 m² in 5 different buildings
• Foundations, metal structure, kr-18 system metal roof, perimeter walls, concrete floors, platforms, maneuvering yards and roads

PLANT POWDERED MILK PRODUCTS LONEG

Gómez Palacio, Durango
• 978940.41 tons
• Duration: 1 year
• Building of different levels at a height of 48 m

DON PERFECTO VINEYARD EVENT ROOM

Parras, Coahuila
• 1,950 m²
• 93,000 tons
• KR-18 system cover, losacero system
• Duration 6 months

COVA EVENT CENTER

Torreón, Coahuila
• Terraces, foundation and metal structure, multipanel roof

CONVENIENCE STORES LA ESMERALDA

Cd. Lerdo, Durango
• 2,902 m²
• 156778.73 tons
• Panel
• 1-1/2" Multi Roof and Foil
• Duration: 4 months
• Terracerias were built
• Duration: 6 months

TOWER CONSULTORIOS 50 DOCTORS

Torreón, Coahuila
• 4,400 m² on 8 levels
• 152,257 tons
• Foundation, metal structure, steel system
• Duration: 9 months

FERRETO distribution center and store

Cd. Juarez, Chihuahua
• 5,150 m²
• 162,621 tons
• KR-18 system
• Duration: 9 months

INDUSTRIAL BUILDING FOR HOSPITALIZATION

Torreón, Coahuila
• 1,393.67 m²
• 53,043.01 tons
• KR-18 system
• Duration: 5 months

INDUSTRIAL WAREHOUSE FOR STORAGE FERRETO

Monterrey, Nuevo León
• 4,626 m²
• 130.111 tons
• KR-18 system
• Duration: 5 months

SPANISH SANATORIUM APP

Torreón, Coahuila
• Expansion of the main structure in the area of operating rooms and rooms based on pile foundations, metal structure, steel floor system

PLAZA COMERCIALPLAZA 505

Torreón, Coahuila
• 6,298.6 m²
• 200 tn Estructura métalica
• 3,500 m² Sistema losacero
• Terracerías, cimentación, obra civil, y estructura metálica

POULTRY HOUSES FOR FATTENING

Matamoros, Coahuila
• Zintro R-101 Galvanized Sheet
• Duration: 6 months

Breeding and Breeding Poultry Farms

Ceballos, Durango
Development of 48 breeding poultry farms, including the Breeding phase, using a modular construction model and the use of cutting-edge technologies, with the production of concrete on site through our mobile Fiori plant and the execution of multipanel walls.

LAS VEGAS STABLE

Francisco I. Madero Coahuila,
Structure for pens and milking room